GUIDE TO ENERGY INCOME DEDUCTION

    • How does it work?
      Launched in February 2007, the New
    • Energy Bill
      simplifies the procedures for gaining access to attractive incentives that provide for a contribution to the energy production of photovoltaic
    • (
    the electricity grid with power less than 1KW
      ). Can apply for the subsidy-free energy, holdings, condominiums and public administrations.
    • Just ask the manager of the National Electrical Ser vices
    (GSE di voler usufruire degli incentivi per un impianto fotovoltaico connesso alla rete, con limite massimo entro 60 giorni dalla data di entrata in esercizio dell'impianto , pena la decadenza dell'incentivo.
    Non sono previste graduatorie, quindi tutti i progetti (almeno per i prossimi anni) saranno finanziati
    . Alla realizzazione dell’impianto, fatta la connessione di allaccio alla rete locale, e successivo collaudo, il Gestore erogherà gli incentivi su tutta l’energia prodotta dall’impianto fotovoltaico. Il sistema di incentivazione prevede contemporaneamente due vantaggi economici: 1. il contributo di produzione su tutta l’energia prodotta dall’impianto (indipen­dentemente che questa sia anche consumata). 2.
    il risparmio del costo dell’energia consumata
    : in un regime di scambio, se l’energia che produciamo è pari all’energia che consumiamo, la bolletta annuale è pari a zero. Al posto dell’autoconsumo si può optare per la vendita dell’energia (serve una partita IVA): in tal caso l’energia sarà venduta a un prezzo già prefissato di 0,0964 €/kWh (per impianti domestici) mentre si continuerà ad buy the energy normally consumed.

    The convenience of the two modes is to be evaluated case by case basis, but usually it is advisable to opt for the sale when the energy of the PV system is much higher consumption. While in the opposite case, when you want plant needed to cover their electricity consumption
    the best choice is the exchange in place that allows this as a double incentive (sales and savings on consumption)
    .


    The sum of both the economic benefits can repay the cost to build the facility which, according to its size, has a payback period that generally ranges from 6 to 12 years.
    The production of photovoltaic energy to other things being equal depends on the location in which they are installed. A plant in northern Italy produces on average 1,150 kWh per KW installed, one at 1,280 KWh Centre Italy, one in South Italy 1500 KWh.

    This means that a system of 3 kilowatts of installed power in central Italy such as Foligno, located to the south and without shading, produces in a year about 3,800 kilowatt-hour of energy . This energia viene erogato il contributo diverso in base alla tipologia di impianto realizzato differenziando per impianti integrati, parzialmente integrati e non integrati. Quindi nel caso di impianto integrato nel Centro Italia annualmente si avrebbe un ricavo dalla vendita di circa 1.900 euro.

    Taglia di potenza dell’impianto
    Non integrato (€/kWh)

    Parzialmente integrato (€/kWh)

    Integrato (€/kWh) 1 kW 3 kW
    0,39

    P> 20 kW Integrated plants: plants whose modules replace the roof on which they are installed. EXCHANGE ON SITE
    0,43

    0.48



    3 kW 6 kW


    0.37 0.41 0.45
    <>







    <>




    0.35


    0.39 0.43

    I Installations are not integrated
    : plants on the ground or on roofs but slightly above the surface.
    partially integrated systems: systems coplanar to the surface (roofs, facades roofs).






    :
    for exchange means that the energy produced can be consumed directly (just now produced is used) or indirectly (because it is fed into the grid is not necessary and resumed when it consumes). In any case, the savings is equal to the price of energy that would otherwise be purchased (then about 15 euro cents per kWh). This benefit is added to the sale price of photovoltaic energy produced by the plant.


    addition to base rates, the Energy Bill provides for a further 5% increase in cases in which:

    realized in a non integrated system with higher power to 3KW and consumed more than 70% of energy produced.
    addition, the same increase is expected when the structure on which the plant produces:


    is a school or a public health facility
    be replaced in the cover asbestos or asbestos-containing plant to install the integrated

    incentives of the Energy Account, you can add capital funding (eg regional funding) for a percentage of the cost of the
    not exceeding 20%. This limit does not apply to public schools and health facilities.

    • I the contribution is contracted for 20 years . At the end of the contract will cease the contribution sull’energia prodotta mentre si potrà continuare a risparmiare grazie all’autoconsumo, o nel caso di cessione delle eccedenze, guadagnare sulla vendita.
    • Il Gestore Elettrico richiede che i pannelli e gli inverter siano certificati secondo le normative nazionali e internazionali e che l’impianto sia realizzato secondo le normative vigenti.
    • L’uso di materiali non conformi esclude dal finanziamento. In Comune:
    • Per costruire un impianto fotovoltaico, se la potenza non è superiore a 20KW, è sufficiente presentare la DIA, Dichiarazione inizio lavori, in Comune ( per dettagli e novità vedi anche questo post ), inoltre è considerato impianto non industriale e conseguentemente non è soggetto alla verifica ambientale (Pres. Rep. 12.04.96),
    a meno che non sia ubicato in aree protette, in quel caso occorre un ulteriore verifica in Comune o in Regione. Per dubbi o altri chiarimenti è possibile venire allo sportello energia oppure scriverci una mail.
    Per altre info e risposte del GSE alle domande più frequenti sul fotovoltaico clicca qui .

    Un esempio di calcolo per il Centro Italia con impianto da 3 kW parzialmente integrato:


    Risparmio Energia

    Savings Bill - Exchange-place

    Revenues from sale of energy

    Tempo di ritorno dell'investimento 8,4 anni che scendono fino a un minimo di 6 con altre maggiorazioni della tariffa incentivante. GUIDA AL CONTO ENERGIA

    Total Savings Income

    3900 kWh / years

    € 780 per year

    € 1,716 / year

    € 2,496 / year

    PS: Sono online anche la

    e la LA GUIDA ALL'INTEGRAZIONE ARCHITETTONICA pubblicate dallo stesso GSE.







    Thursday, August 20, 2009

    Youth Group Sports Motto



    I "buoni" Infissi sono anche Detraibili


    Occorre controllare attentamente la tenuta dei serramenti. Le infiltrazioni provenienti dalle finestre provocano dei rinnovi d’aria eccessivi, con relative dispersioni di calore. È buona norma controllare periodicamente lo stato delle guarnizioni poste sulle battute delle ante e sostituirle se necessario. Naturalmente, se abbiamo vecchi modelli di serramenti che non hanno le gaskets must arrange for their installation. Also, small air infiltration can be removed from the frame using silicone. To improve the insulation of the glass surfaces: When the windows have only one glass can choose to: • replace the glass with a single or double pane window where you can add a second behind or in front of the old; • • Install a "film solar reflective surfaces of the windows. The film solar light passes but does not allow the passage of heat, so can do more to stay cool in summer and warmer in winter, and also holds the shards in the event of glass to shatter.

    If we decide to replace or improve the frame, the Finance comes to us ...
    It is always the talk that the payments should be made by bank transfer or post office and you need a certificate of qualification energy performance (although the latter, in the 2008 Budget being approved, for windows and solar panels , will be eliminated).

    The deduction on costs for the implementation of the measures referred to in Article 1, paragraphs 2 to 5, it is for the expenditure of:
    interventions resulting in a reduction of thermal transmittance U

    of windows including the frames through :

    1. improving the thermal characteristics of existing facilities with the supply and installation of a new window, including frame
    ;


    2. improving the thermal characteristics of glass components in place, with additions and substitutions.

    (Sworn of interventions on existing buildings) 1. For the interventions on existing buildings, referred to in Article 1, paragraph 3, the affidavit referred to in Article 4, paragraph 1, letter a),

    specifies the original value of the transmittance of the component on which you operate and that, after all ' intervention, the transmittance of the same components are less than or equal to the values \u200b\u200breported in the table in Annex D to this Decree
    . 2. In case of replacement of windows including frames the affidavit referred to in Article 4, paragraph 1, letter a) on the enforcement of specific minimum requirements set out in paragraph 1 above, may be replaced by a certification of producers of these elements, which indicates compliance with those requirements, together with the certificates issued in respect of the individual components of the European legislation on the attestation of conformity
    .


    ANNEX D Table of the limits of useful thermal transmittance U of the structures in terms of building envelope components (W/m2K):







    Social Security Disability And Radiculopathy

    THE DOORS AND WINDOWS IN THE AREA - 55% AQE



    deduction of 55% for the cost of replacing the boiler with a condensing of 15 August nothing AQE



    As for windows and solar panels, now with the Law 99/2009, for any replacements of the old boiler with a modern condensing will no longer need the ' AQE (Certificate of Qualification energy) we can write the simplified form this site ENEA in the transmission applications.

    Here is the response of the technicians to ENEA specific questions about:

    From the website of ' ENEA :


    I knew that with the recent Law 99/2009 is no longer required a certificate of qualification energy to replace heating systems with boilers condensation. But what are the operational conditions for being able to properly make use of this simplification?
    R - Article. 31 of Law 99 of July 23, 2009, in force since 08.15.2009, deleting the requirement to produce the AQE for those who wish to deduct 55% to rely on paragraph 347 of the 2007 Budget.

    Currently there are no further clarification by the Ministry of Economic Development on what should be, however, the documents to be submitted and therefore, pending clarification of these, similar to other series already included in our faq 43, it is believed that those who have completed the work before 15 / 8 are required to submit both Annex A and Annex E, while those who complete the work from 15 / 8 are subject to complete and send to all ' Aeneas Annex E only through the website sending
    http://finanziaria2009.acs. enea.it

    .
    If this is not yet structured to allow the sending of only Annex E or documentation that would eventually be required by the Ministry, is believed to be a simple means to send by registered only for actors can take advantage of new legislation relating to paragraph 347.

    Service Ideas Sorority

    NOTHING TO REPLACE THE OLD WITH A CONDENSING BOILER AND COAT THERMAL INSULATION

    If it is cold, put on her coat to the house! If you're building (or even radically restructuring) walls or roof of a building, there should be a gap which can then be filled with the appropriate insulating materials. In the case of existing buildings is the installation of an optimal coverage "cowling" or by installing plaster panels and insulating panels on the outside (or even inside) of the walls. insulation reduces the heat transfer through the walls, taking care to reduce waste heat inside in winter and reduce the heat transfer from the outside in the summer.
    remember that
    isolation is even more important because they account for covers most of the vertical walls on the thermal comfort environments. A coat materials in thermal costs around 30-40 euro per square meter, in addition to improving thermal comfort in winter and summer protects the walls and reduces the phenomena of moisture from outside.
    Click HERE to learn more about these technologies.


    Sunday, August 9, 2009

    High Efficiency Wood Stove



    Along with the return of nuclear power and some good news for photovoltaics, the bill approved by the Government is also developing new penalizing oneri per i piccoli impianti che fanno lo scambio sul posto


    Da

    Nextville

    :


    Ddl sviluppo, nuovi oneri per l'energia prodotta e utilizzata sul posto
    (Di Filippo Franchetto)
    Il Ddl sviluppo, definitivamente approvato dal Senato, introduce numerose disposizioni riguardanti anche i temi dell'energia.
    Oltre al preannunciato ritorno nel club del nucleare, altre norme stanno destando la preoccupazione degli operatori del mondo delle rinnovabili and cogeneration. The dock is finished
    paragraph 5 of '
    Article 33, which reads: "... from the date of entry into force of this law the tariff charges for transmission and distribution and those covering the general costs of the system ..., are determined by reference solely to the electricity consumption of end customers or parameters relating to the connection point of the same end customers. " It will be for the Authority for electricity and gas to adjust, within 90 days "their determination to implement a quanto disposto …”.

    Questo comma ha innescato una serie di
    reazioni
    furenti. Cogena , associazione che rappresenta 43 aziende del settore cogenerazione, in un recente comunicato stampa sostiene che a causa di questa norma, “in Italia gli impianti di cogenerazione verranno spenti perché il loro funzionamento costerà così tanto all’utente finale da rendere questa tecnologia assolutamente fuori mercato ”. Sempre secondo Cogena, i costi di autoproduzione di energia elettrica “aumenteranno mediamente 15% of
    . And yesterday is a
    open letter to the government , Sole24ore and published on the Corriere della Sera, in which four major business associations (Act, ASSOESCO, Cogen, Intergen) are asking "what is the meaning of the Bill 1195 B/09 ( ddl development, ed ) that art. 33 introduces new fees and charges system and used on the electricity produced on site from renewable sources and cogeneration .... But try to understand better the likely negative of this article, framing them within the current legislation governing the self-production of electricity. The regime of "net metering " electricity accessible to all facilities from renewable sources and cogeneration up to 200 kW of power, has undergone substantial changes since January 1, 2009, the entry into force of the resolutions 74/08 and 01/09 of the Authority for Electricity and Gas. "The exchange service on the spot," according to the definition of the Authority, "is in achieving a particular form of on-site consumption
    , by allowing the electricity produced and fed into the grid can be collected and consumed in a different time from that in which production takes place, thus using the power system which tool for virtual storage of electricity, but not simultaneously consumed.
    The economic rationale and the exchange on the spot, based on the assumption that anyone who owns a small wind that exchanges energy with the network ,
    not suffer - for the part of energy exchanged - the burden of network services (trasmissione e distribuzione). Infatti, se produco e immetto in rete 100 kWh e ne prelevo – attraverso il medesimo punto di connessione – altrettanti, in realtà è come se avessi prodotto e auto-consumato in loco tutta l’energia che è stata scambiata. Il ddl sviluppo, invece, intende applicare i corrispettivi di trasmissione e di distribuzione, nonché gli oneri generali di sistema, facendo “esclusivo riferimento al consumo di energia elettrica dei clienti finali o a parametri relativi al punto di connessione dei medesimi clienti finali”. I corrispettivi e gli oneri, quindi, verrebbero applicati su tutta l’energia auto-prodotta e consumata, senza tener account of how the system actually exchanged with the network.

    This interpretation is supported also by
    Edo Ronchi, president of the Foundation for Sustainable Development and former environment minister. In an interview with the newspaper online Greenreport, Ronchi explains: "Before people had a system of micro-or small pay the difference between energy consumed and that one which produced and invoiced the delta to the network, which ranged the costs of transmission and distribution. For example, if 10 kWh invoiced on these paid 30% of transmission charges and billing. Now with Article .33 development of the bill, regardless
    the quantities consumed and produced, the burden of 30% is charged on everything. Unless those who use high-voltage networks, that is, large producers remain subject to the old system. " This last clarification is particularly important to Ronchi. Also within Article 33 deals with the issue of
    Networks internal user
    (RIU), which cover all electric generating capacity in the service of industrial power users. Well, the RIU not sono colpite dai nuovi corrispettivi previsti per i piccoli impianti, dal momento che il comma 6 stabilisce che soltanto per le RIU “i corrispettivi tariffari di cui al comma 5 si applicano esclusivamente all’energia elettrica prelevata nei punti di connessione”. E dunque non anche all’energia prodotta e autoconsumata. Insomma, ci sono elementi sufficienti per giustificare l’allarme lanciato dalle associazioni nella lettera al Governo, nella quale si legge tra l’altro che tali provvedimenti “ aggravano i costi energetici delle piccole, medie e grandi aziende impegnate a ridurre i costi di produzione e a competere best on an international scale. " The new standard is even more absurd when you consider that paragraph 20 of Article 27 of the draft bill development, provides
    simplifications authorization
    for micro CHP (plants up to 50 kW) and combined small size ( systems up to 1 MWe). Paragraph 20 states that fact for the installation and operation of micro-cogeneration units will only require a notification by the competent authority within the meaning of the Uniform Building. For the installation and operation of small scale units will require a simple DIA (Allegation of Home Activities). So while on the one hand it seems that you want to promote renewable energy and energy efficiency, the other introducing new undue burden that will further slow down our path towards the Kyoto target and those in Europe to 2020.